[go: up one dir, main page]

Proto,tx_rollup: allow predecessor commitments without any final levels

Context

In !4583 (merged) we rewrote the entire rollup level tracking system. The new system is quite complicated, and somewhat under-tested.

Manually testing the MR

The new test was red and is now green.

Checklist

  • Document the interface of any function added or modified (see the coding guidelines)
  • Document any change to the user interface, including configuration parameters (see node configuration)
  • Provide automatic testing (see the testing guide).
  • For new features and bug fixes, add an item in the appropriate changelog (docs/protocols/alpha.rst for the protocol and the environment, CHANGES.rst at the root of the repository for everything else).
  • Select suitable reviewers using the Reviewers field below.
  • Select as Assignee the next person who should take action on that MR

Merge request reports

Loading