[go: up one dir, main page]

Menu

#42 Suggestions for the extension of the post termination workflow cost presentation service

3.5
open
nobody
None
1
2013-03-22
2013-03-22
No
  1. Beside the “Total cost” the storage related and the computational time related partial costs should be reported as well.
  2. The computational time related partial cost should be extended by the presentation of the estimated (per hour)costs as this cost entity is visible now only in the configuration view of a workflow job)

2.The table elements should be visible not only for the whole workflow but for all the terminated job instances paid for.
3. A separate “accumulated” and a an separate “detailed” view is suggested for the presentation of costs in the case of terminated job instances belonging to a common job (case of parametric sweep jobs)
4. The actual size of the transferred input and output data belonging to the separate job instances can be presented ( via dividing measured storage costs by the storage unit costs) as well. This may be very useful for general debugging and for the cost estimations of further workflow submissions.

Discussion


Log in to post a comment.