WO1996006260A1 - Template construction for drilling subsea wells for oil and gas - Google Patents

Template construction for drilling subsea wells for oil and gas Download PDF

Info

Publication number
WO1996006260A1
WO1996006260A1 PCT/NO1995/000137 NO9500137W WO9606260A1 WO 1996006260 A1 WO1996006260 A1 WO 1996006260A1 NO 9500137 W NO9500137 W NO 9500137W WO 9606260 A1 WO9606260 A1 WO 9606260A1
Authority
WO
WIPO (PCT)
Prior art keywords
foundation
template construction
central body
template
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NO1995/000137
Other languages
French (fr)
Inventor
Jean-Louis Daeschler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OIL ENGINEERING CONSULTANTS DRILLING AS
Original Assignee
OIL ENGINEERING CONSULTANTS DRILLING AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OIL ENGINEERING CONSULTANTS DRILLING AS filed Critical OIL ENGINEERING CONSULTANTS DRILLING AS
Priority to AU33565/95A priority Critical patent/AU3356595A/en
Publication of WO1996006260A1 publication Critical patent/WO1996006260A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/037Protective housings therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/08Underwater guide bases, e.g. drilling templates; Levelling thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/017Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station

Definitions

  • the present invention concerns a drilling template and well foundation for two or more subsea units for petroleum production ecruipment units, infra called foundation/tem ⁇ plate construction, and which may be handled and installed through conventional moonpool opening whereof the dimen- sions normally are e.g. 6m x 6m.
  • the device according to the invention comprises a central support unit to which there are mounted arms. Such a construction makes it possible to simplify transportation, submerging and mount ⁇ ing the foundation/template construction on the drilling site. Additionally it is disclosed a protection structure for each of the subsea drilling holes with ' mounted pro ⁇ duction equipment, e.g. valve trees, manifolds, pipe tightening equipment and connecting equipment.
  • the device according to the present inven- tion may be mounted and operated by using conventional mobile drilling rigs, i.e. without using lifting ships or crane ships. All components are of a size and of such a weight that they may be handled without using special equipment on the drilling rig.
  • a geographical area being associated with a petroleum production rig may have a number of foundation/template constructions and satellite wells being normally bound to each other or directly to the production platform by using subsea pipelines for further handling of the petrol and transport ashore.
  • the foundation/template constructions comprise normally a number of well head equipment gear (valve trees) , manifolds for collecting or distribute well liquids, control equipment for the wells as well as pipe- line/control lines.
  • the reduction of the costs for foundation/template constructions has sig ⁇ nificant advantages.
  • One way to achieve this is to reduce the size, the weight and the complexity of the foundati ⁇ on/template construction for thus reducing the fabrication costs.
  • the installation costs are reduced dramatically if the mobile drilling rig being used to drill the wells, also may be used to install the foundati ⁇ on/template construction the associated equipment for thus to eliminate the expenses by using specialized lifting vessels.
  • the device according to the present invention is suited for being transported and installed with one and the same vessel which also is employed for drilling and completion of the wells and for installing the necessary protection of the subsea equipment.
  • NO patent 152.060 disclosed a large and heavy subsea template as well as the submersion thereof.
  • the subsea template being disclosed in this prior Norwegi ⁇ an patent comprises admittedly horizontally hinged and pivotable arms, but such a device must all the same be mounted and transported with especially constructed ves ⁇ sels on account of its size and weight, something which the present applicant has sought to avoid with the present invention.
  • the device disclosed in Norwegian patent no. 152.060 may neither be. installed through a conventional moonpool in existing drilling rigs.
  • the main purpose of the present invention is to provide a subsea foundation/template construction system (subsea template with protection of manifold, valve trees and other necessary production equipment) and which may be installed through the moonpool of a conventional drilling rig without the need for using heavy lifting vessels and other special equipment for the operation.
  • Another pur ⁇ pose of the present invention is to produce a foundati ⁇ on/template construction system which is easy and simple but still has the necessary structural strength, which is economical to produce, assemble and use, to give a founda ⁇ tion and protection for all the necessary subsea equipment (with or without a protective structure) .
  • Still another purpose of the present invention is to provide a standard foundation/template construction having sufficient flexibility in its design to be used in dril ⁇ ling fields with a large number of wells, by assembling several foundation/template constructions. Such a solu- tion will additionally be less dependent on seafloor conditions than a conventional foundation/template con ⁇ struction for more than one wells.
  • Still another purpose of the present invention is to produce a construction for protecting the subsea install ⁇ ation against over-trawling and against falling objects and which also may be transported without using specially constructed vessels and equipment and be installed via the moonpool opening.
  • the protective structure for each of the subsea modules (valve trees, manifolds and other necessary equipment) , may independently be disassembled and brought in, and in this manner the other modules are protected during activities being performed on one of the modules.
  • the device according to the inven- tion allows an improved possibility for using remotely controlled vessels (Remote Operated Vehicles, (ROV) ) .
  • ROV Remote Operated Vehicles
  • Figs. 1 and 2 show the foundation/template construction according to the present invention without assembled subsea equipment and protective structure, seen from above and from the side, respectively;
  • Fig. 3 shows the device according to the present invention seen form the side with mounted representative subsea production equipment, but without a protective structure;
  • Figs. 4 - 7 show different stages of the mounting of leading elements and the foundation/template construction according to the present invention
  • Fig. 8 shows a mounted endwiselated foundation/template construction according to the invention with a temporary leading base and with a mounted first part of a protective structure with an integrated permanent leading base;
  • Fig. 9 shows the mounting sequence of the protective structure for subsea equipment where each of the three sections in which the structure is divided, is present as an integrated part of the subsea equipment (manifold, valve trees, etc.);
  • Fig. 10 shows a perspective picture of the found- ation/template construction according to the present invention at the mounting to a temporary leading frame with leading strings and elevated arms;
  • Fig. 11 shows a perspective picture of the found- ation/template construction according to the invention in mounted condition before drilling through the arms has started;
  • Fig. 12 shows a perspective picture of the found- ation/template structure according to the invention in mounted condition and with a mounted protective structure over all, except one, module; and Figs. 13 and 14 show the design of one embodiment of a supporting device for the arms of the foundation/template construction according to the invention.
  • the structure of the foundation/template construction according to the present invention is shown in figs. 1 and 2, and comprises a central foundation 1 having the shape of a polygonal body, (in the figure shown as a mainly square body, even if other designs, e.g. triangular, pentangular, hexangular etc., are possible).
  • a central foundation 1 having the shape of a polygonal body, (in the figure shown as a mainly square body, even if other designs, e.g. triangular, pentangular, hexangular etc., are possible).
  • the centre foundation comprises additionally a mainly centrally located hole.3 through which there may be lo- cated a leading pipe (see the disclosure infra) .
  • the centre foundation will usually be made of metallic plates or beams, e.g. of metal such as aluminum or other metal alloys.
  • metal such as aluminum or other metal alloys.
  • the strength and the composition of such metal or alloys may be determined by the person skilled in the art in each separate instance, but materials such as steel, optionally strengthened composite materials etc. may be used.
  • the supporting arms 2 being pivotally connected to the central foundation 1 at its upper side edges, have also preferably the same plate or beam construction and com ⁇ prise, also preferably, the same type of materials as the central foundation 1. Additionally the supporting arms 2 comprise penetrating and mainly vertically running holes 4 for the location and penetration of a drilling string and lining pipes. In fig. 3 there is suggested the location of different types of conventional well equipment 13,15,20 on the centre foundation 1 as well as on the holes 4 of the arms 2. In addition to the penetrating holes 4, there may in the beams or spokes comprising the arms 2 be lo- cated securing devices 5 for additional supporting devices 8.
  • the supporting devices e.g.
  • supporting plates or legs are present to practicelate and support the con ⁇ struction when placed on a sea floor of varying con ⁇ sistency, e.g. on a clay or silt sea floor (see figs. 2, 13 and 14) .
  • the subsea foundation/template construction comprises in a preferred embodiment, a lightweight steel frame which also may comprise in- dependently protected modules (see infra) for each in ⁇ stalled subsea well or other equipment.
  • Typical subsea equipment is valve trees, manifolds and pipe-tightening modules, but the flexibility of the design of the foundation/template construction according to the present invention will also allow other subsea equipment, e.g. pumps, pigging equipment etc. to be installed.
  • the foundation/template construction itself comprises a centre foundation 1 and similar or different arms 2 hinged thereto.
  • the centre foundation 1 The main function of the centre foundation 1 is to support the arms 2 and the subsea manifold module 20.
  • the centre foundation itself is designed to be carried on a cemented leading pipe 6 having been placed vertically in a pre- drilled well through the pre-installed leading frame 7 (Temporary Guide Base (TGB) ) on the sea floor.
  • TGB Temporal Guide Base
  • the centre foundation 1 and the arms 2 have leading poles 9 preferably being compatible with an API standard of 6 ft. (2586 mm) centrally located in a square about the permanent leading frame (Permanent Guide Base) 13.
  • the centre foundation 1 and the arms 2 are produced and tested on the fabrication site where all the tolerances may be adjusted.
  • the arms may be disassembled and if the components of the foundation/template construction are sufficiently light and small, they may be transported by road from the production site to a key plant with common trucks or lorries and with transport vessels or vehicles to the rig where they are lifted aboard with a deck crane.
  • the found ⁇ ation/template construction is assembled in the moonpool area of the rig with its arms in an upwards pivoted posi ⁇ tion like an inverted umbrella.
  • the height of the assemb- led foundation/template construction is less than the normal free height under the drilling deck for thereby to allow the closed foundation/template construction to be pushed along the lower deck to the moonpool of the rig.
  • Standard drilling pipes are used with the mounting equip- ment to lower the assembled and closed foundation/template construction to the sea floor where it is placed on the pre-installed conventional leading frame 7.
  • the hinged arms 2 are pivoted outwards and are locked into position in a conventional manner.
  • additional devices for installing the arms 2 e.g. stabilizing props (mud mat jacks) for muddy or silt sea- floor conditions 8, may be adjusted individually toover- late the foundation/template construction before cementing a central pipe 6.
  • a temporary leading frame (Temporary Guide Base (TGB) ) 7 by using a drilling string 10 and a running tool 11.
  • This frame is of a conventional type and its installation may be performed in a conventional manner.
  • the centre foundation 1 After placing the leading frame (TGB) 7 on the sea floor and drilling a hole, the centre foundation 1 according to the present invention with is assembled arms (the found ⁇ ation/template construction) in a closed position, is lowered onto the leading frame (TGB) 7 (see the disclosure supra for the mounting and lowering of the found ⁇ ation/template construction) .
  • the centre foundation 1 For placing and mounting the centre foundation 1 on the leading frame (TGB) 7, there is mounted a leading pipe 6 through the central hole 3 of the centre foundation as well as through the central hole of the leading frame (see fig. 7) .
  • the leading pipe is lowered together with the foundation/template con- struction.
  • the arms 2 After having placed the centre foundation with the arms 2 in an upright position onto the leading frame, the arms 2 are lowered (fig. 7) by pivoting them about their hinged pivot axis. The arms 2 are then locked in their correct positions to the central foundation 1 by using conven ⁇ tional remote-controlled units and locking devices 14. The locking of the arms 2 to the central foundation 1, may, as an example, by using adjustable locking pins 14 (see fig. 7) .
  • the complete subsea foundation/template construction is then finely adjusted/nivellated to lie horizontally so that the leading pipe 6 lie in an upright and vertical position in the drilling hole. Then the leading pipe 6 is cemented in place in a vertical position in the drilling hole.
  • the devices 8 (mud mats) will have a double function, i.e. carrying the supporting arms 2 as well as horizontally adjusting the same.
  • the subsea production equipment which is being used will, as mentioned supra, be subject to damage of different types, e.g. falling objects from above or over-trawling by fishing boats etc.
  • Such protective hoods is of great importance for pro ⁇ tecting the subsea equipment and the foundation/template construction according to the invention, and with the present foundation/template construction it is preferred to use protecting hoods being divided in sections.
  • FIG. 9 The installation of such hoods is shown in fig. 9 wherein there also is shown the sectionvise division of the hood assembly.
  • the lower part 17 of the hood assembly is mounted and installed together with permanent guidance frame (PGB) .
  • the middle part 18 of the hood assembly is installed and mounted together with the valve tree 15 or other production equipment being placed on top of the lower section.
  • the upper part 19 of the protection struc- ture is installed and finally mounted together with the valve tree cap (tree cap) 16 on top of the middle part 18.
  • FIG 9 there is shown an assembly of three parts of the protection construction which is relevant for instal ⁇ lation and finishing of production (or injection) wells.
  • the foundation/template construction according to the invention will be illuminated infra in connection with one embodiment example.
  • the indicated embodiment example being relevant for a conventional drilling wherein the wells are established with a 30" (762 mm) lining pipe, is in no way to be regarded as limiting for the invention. In other drilling techniques, e.g. "thin hole drilling", some of the dimensions may be altered.
  • the central foundation 1 comprises a quadratic body with side edges by a size of 2900 mm.
  • a penetrating hole 3,4 being 914,4 mm in diameter. This makes room for a lining pipe (6,12) of 762 mm in diameter running through the hole 3,4.
  • the distance between the centre of the central hole 3 and the centre of the holes 4 running through the arms 2, is 6000 mm.
  • arms 2 and central foundation 1 is 1000 mm.
  • the distance from the hinges to the inclination of the reciprocal parts of the arms is 1250 mm and the length of the arms where the parts incline towards each other to- wards the centre of the penetrating hole 4 is 3250 mm.
  • the supporting devices 8 for the arms 2 being shown in figs. 13 and 14, comprise in this embodiment circular discs ("mud mats") with a diameter of 2000 mm. These discs are hinged by using a ball bearing to the adjustable arms, said arms in their turn being hinged at the mounting point to the arms 2.
  • mud mats circular discs
  • Such a construction has as an effect that the supporting devices 8 may be adjusted in any angle in relation to the foundation, but it will be pointed out that this embodiment is only one of a number of possibili ⁇ ties, since the mechanical properties of the sea floor require varying demands as to size and design of the "mud mats" .
  • foundation/template construction according to the invention has been indicated with respect to the embodiment shown in the figures, but obvious variations of the construction will be evident to the person skilled in the art without departing from the idea behind the foundation/template construction.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Foundations (AREA)

Abstract

There is disclosed a subsea foundation/template construction comprising a polygon, preferably square central body (1), to which body (1) there exists at least one horizontally hinged arm (2) so that the arm(s) (2) may be pivoted from a mainly vertical to a mainly horizontal position over an angle of about 90°. The present foundation/template construction comprises parts which may be assembled on the drilling site and which may be submerged through a conventional moonpool of a drilling rig without the need for special vessels for transporting or mounting the foundation/template.

Description

TEMPLATE CONSTRUCTION FOR DRILLING SUBSEA WELLS FOR OIL AND GAS.
The present invention concerns a drilling template and well foundation for two or more subsea units for petroleum production ecruipment units, infra called foundation/tem¬ plate construction, and which may be handled and installed through conventional moonpool opening whereof the dimen- sions normally are e.g. 6m x 6m. The device according to the invention comprises a central support unit to which there are mounted arms. Such a construction makes it possible to simplify transportation, submerging and mount¬ ing the foundation/template construction on the drilling site. Additionally it is disclosed a protection structure for each of the subsea drilling holes with' mounted pro¬ duction equipment, e.g. valve trees, manifolds, pipe tightening equipment and connecting equipment. Further advantages with the device according to the present inven- tion is that it may be mounted and operated by using conventional mobile drilling rigs, i.e. without using lifting ships or crane ships. All components are of a size and of such a weight that they may be handled without using special equipment on the drilling rig.
The process chosen when expanding a subsea oil field is a compromise between requirements concerning the draining of the well, safety during production and economical factors. This has resulted in that the main part of the development within subsea petroleum reservoir installations has got a unified design and have normally been operated by using large and heavy foundation/template constructions having been built for this purpose, integrated with trawl-resist¬ ant protection structures. These demand heavy and large lifting vessels for being installed prior to drilling wells and mounting the drilling head by using conventional mobile drilling rigs. A geographical area being associated with a petroleum production rig may have a number of foundation/template constructions and satellite wells being normally bound to each other or directly to the production platform by using subsea pipelines for further handling of the petrol and transport ashore. The foundation/template constructions comprise normally a number of well head equipment gear (valve trees) , manifolds for collecting or distribute well liquids, control equipment for the wells as well as pipe- line/control lines. This represents today the solution used for extracting exploitable subsea petrol fields. Together with the need to find economical solutions for exploiting small fields at sea and expand the draining capacity at already existing reservoirs, the reduction of the costs for foundation/template constructions has sig¬ nificant advantages. One way to achieve this is to reduce the size, the weight and the complexity of the foundati¬ on/template construction for thus reducing the fabrication costs. In addition the installation costs are reduced dramatically if the mobile drilling rig being used to drill the wells, also may be used to install the foundati¬ on/template construction the associated equipment for thus to eliminate the expenses by using specialized lifting vessels.
Furthermore the development of a standard foundation/temp¬ late construction, which also fully may be operated by any mobile drilling rig independently from the design of the well or the seafloor conditions, is considered to be of great importance and represents a significant advantage. The optimum number of standardized foundation/template constructions may thereby be used for adaption to the special subsea drilling area. This is especially inter¬ esting when considering draining a marginal oilfield.
The economical advantages by reducing the total time for project development are self-evident. In addition the device according to the present invention is suited for being transported and installed with one and the same vessel which also is employed for drilling and completion of the wells and for installing the necessary protection of the subsea equipment.
Previously there has been made attempts to solve the above indicated problems, but without success.
Thus there is in NO patent 152.060 disclosed a large and heavy subsea template as well as the submersion thereof. The subsea template being disclosed in this prior Norwegi¬ an patent comprises admittedly horizontally hinged and pivotable arms, but such a device must all the same be mounted and transported with especially constructed ves¬ sels on account of its size and weight, something which the present applicant has sought to avoid with the present invention. The device disclosed in Norwegian patent no. 152.060 may neither be. installed through a conventional moonpool in existing drilling rigs.
In GB patent 2.202.257 there is also disclosed a foundati¬ on/template construction for drilling single subsea wells, and comprising pivotable supporting legs, but such a foundation/template construction is only meant for one singe drilling hole. Furthermore the integration/connec¬ tion between each single drilling frame according to this prior art patent will not be performed through hinging, and the connection is done at the sea floor. These dis- advantages is sought to be removed with the present inven¬ tion.
The main purpose of the present invention is to provide a subsea foundation/template construction system (subsea template with protection of manifold, valve trees and other necessary production equipment) and which may be installed through the moonpool of a conventional drilling rig without the need for using heavy lifting vessels and other special equipment for the operation. Another pur¬ pose of the present invention is to produce a foundati¬ on/template construction system which is easy and simple but still has the necessary structural strength, which is economical to produce, assemble and use, to give a founda¬ tion and protection for all the necessary subsea equipment (with or without a protective structure) .
Still another purpose of the present invention is to provide a standard foundation/template construction having sufficient flexibility in its design to be used in dril¬ ling fields with a large number of wells, by assembling several foundation/template constructions. Such a solu- tion will additionally be less dependent on seafloor conditions than a conventional foundation/template con¬ struction for more than one wells.
Still another purpose of the present invention is to produce a construction for protecting the subsea install¬ ation against over-trawling and against falling objects and which also may be transported without using specially constructed vessels and equipment and be installed via the moonpool opening. The protective structure for each of the subsea modules (valve trees, manifolds and other necessary equipment) , may independently be disassembled and brought in, and in this manner the other modules are protected during activities being performed on one of the modules. Additionally the device according to the inven- tion allows an improved possibility for using remotely controlled vessels (Remote Operated Vehicles, (ROV) ) .
Further purposes and advantages of the present invention will be apparent from the further detailed disclosure and figures wherein:
Figs. 1 and 2 show the foundation/template construction according to the present invention without assembled subsea equipment and protective structure, seen from above and from the side, respectively;
Fig. 3 shows the device according to the present invention seen form the side with mounted representative subsea production equipment, but without a protective structure;
Figs. 4 - 7 show different stages of the mounting of leading elements and the foundation/template construction according to the present invention;
Fig. 8 shows a mounted end nivellated foundation/template construction according to the invention with a temporary leading base and with a mounted first part of a protective structure with an integrated permanent leading base;
Fig. 9 shows the mounting sequence of the protective structure for subsea equipment where each of the three sections in which the structure is divided, is present as an integrated part of the subsea equipment (manifold, valve trees, etc.);
Fig. 10 shows a perspective picture of the found- ation/template construction according to the present invention at the mounting to a temporary leading frame with leading strings and elevated arms;
Fig. 11 shows a perspective picture of the found- ation/template construction according to the invention in mounted condition before drilling through the arms has started;
Fig. 12 shows a perspective picture of the found- ation/template structure according to the invention in mounted condition and with a mounted protective structure over all, except one, module; and Figs. 13 and 14 show the design of one embodiment of a supporting device for the arms of the foundation/template construction according to the invention.
The structure of the foundation/template construction according to the present invention is shown in figs. 1 and 2, and comprises a central foundation 1 having the shape of a polygonal body, (in the figure shown as a mainly square body, even if other designs, e.g. triangular, pentangular, hexangular etc., are possible). To at least one of the side edges in the polygonal body 1 there is horizontally hinged a in the vertical direction pivotable arm 2, said arm 2 having a swing over about 90°, i.e. from an upright position in relation to the upper surface of the centre foundation to alignment with the upper surface of the centre foundation.
The centre foundation comprises additionally a mainly centrally located hole.3 through which there may be lo- cated a leading pipe (see the disclosure infra) .
The centre foundation will usually be made of metallic plates or beams, e.g. of metal such as aluminum or other metal alloys. The strength and the composition of such metal or alloys may be determined by the person skilled in the art in each separate instance, but materials such as steel, optionally strengthened composite materials etc. may be used.
The supporting arms 2, being pivotally connected to the central foundation 1 at its upper side edges, have also preferably the same plate or beam construction and com¬ prise, also preferably, the same type of materials as the central foundation 1. Additionally the supporting arms 2 comprise penetrating and mainly vertically running holes 4 for the location and penetration of a drilling string and lining pipes. In fig. 3 there is suggested the location of different types of conventional well equipment 13,15,20 on the centre foundation 1 as well as on the holes 4 of the arms 2. In addition to the penetrating holes 4, there may in the beams or spokes comprising the arms 2 be lo- cated securing devices 5 for additional supporting devices 8. The supporting devices, e.g. supporting plates or legs (mud mats) are present to nivellate and support the con¬ struction when placed on a sea floor of varying con¬ sistency, e.g. on a clay or silt sea floor (see figs. 2, 13 and 14) .
The subsea foundation/template construction according to the invention comprises in a preferred embodiment, a lightweight steel frame which also may comprise in- dependently protected modules (see infra) for each in¬ stalled subsea well or other equipment.
Typical subsea equipment is valve trees, manifolds and pipe-tightening modules, but the flexibility of the design of the foundation/template construction according to the present invention will also allow other subsea equipment, e.g. pumps, pigging equipment etc. to be installed.
The foundation/template construction itself comprises a centre foundation 1 and similar or different arms 2 hinged thereto.
The main function of the centre foundation 1 is to support the arms 2 and the subsea manifold module 20. The centre foundation itself is designed to be carried on a cemented leading pipe 6 having been placed vertically in a pre- drilled well through the pre-installed leading frame 7 (Temporary Guide Base (TGB) ) on the sea floor.
The centre foundation 1 and the arms 2 have leading poles 9 preferably being compatible with an API standard of 6 ft. (2586 mm) centrally located in a square about the permanent leading frame (Permanent Guide Base) 13.
The centre foundation 1 and the arms 2 are produced and tested on the fabrication site where all the tolerances may be adjusted. The arms may be disassembled and if the components of the foundation/template construction are sufficiently light and small, they may be transported by road from the production site to a key plant with common trucks or lorries and with transport vessels or vehicles to the rig where they are lifted aboard with a deck crane. By using standard rigging equipment the found¬ ation/template construction is assembled in the moonpool area of the rig with its arms in an upwards pivoted posi¬ tion like an inverted umbrella. The height of the assemb- led foundation/template construction is less than the normal free height under the drilling deck for thereby to allow the closed foundation/template construction to be pushed along the lower deck to the moonpool of the rig. Standard drilling pipes are used with the mounting equip- ment to lower the assembled and closed foundation/template construction to the sea floor where it is placed on the pre-installed conventional leading frame 7. The hinged arms 2 are pivoted outwards and are locked into position in a conventional manner. By using a remote-controlled vehicle additional devices for installing the arms 2, e.g. stabilizing props (mud mat jacks) for muddy or silt sea- floor conditions 8, may be adjusted individually to nivel- late the foundation/template construction before cementing a central pipe 6.
With reference to the figs. 4 - 7 there will now be dis¬ closed the method for locating/mounting the embodiment of the foundation/template construction according to the invention being shown in the figures.
In figs. 4 and 5 there is shown the location/mounting of a temporary leading frame (Temporary Guide Base (TGB) ) 7 by using a drilling string 10 and a running tool 11. This frame is of a conventional type and its installation may be performed in a conventional manner. Through this leading frame (TGB) there may be drilled holes in the ground in a conventional manner by using a drilling string 10.
After placing the leading frame (TGB) 7 on the sea floor and drilling a hole, the centre foundation 1 according to the present invention with is assembled arms (the found¬ ation/template construction) in a closed position, is lowered onto the leading frame (TGB) 7 (see the disclosure supra for the mounting and lowering of the found¬ ation/template construction) . For placing and mounting the centre foundation 1 on the leading frame (TGB) 7, there is mounted a leading pipe 6 through the central hole 3 of the centre foundation as well as through the central hole of the leading frame (see fig. 7) . The leading pipe is lowered together with the foundation/template con- struction.
After having placed the centre foundation with the arms 2 in an upright position onto the leading frame, the arms 2 are lowered (fig. 7) by pivoting them about their hinged pivot axis. The arms 2 are then locked in their correct positions to the central foundation 1 by using conven¬ tional remote-controlled units and locking devices 14. The locking of the arms 2 to the central foundation 1, may, as an example, by using adjustable locking pins 14 (see fig. 7) . The complete subsea foundation/template construction is then finely adjusted/nivellated to lie horizontally so that the leading pipe 6 lie in an upright and vertical position in the drilling hole. Then the leading pipe 6 is cemented in place in a vertical position in the drilling hole.
In connection with adjustment of the supporting arms 2, the devices 8 (mud mats) will have a double function, i.e. carrying the supporting arms 2 as well as horizontally adjusting the same.
With this the mounting of the foundation/template con¬ struction according to the invention is complete, and further subsea operations may be performed via this found¬ ation/template construction. Through the holes 4 in the arms 2 of the foundation/template construction there is drilled wells in a conventional manner with subsea blow¬ out valve trees placed on the permanent leading frame (Permanent Guide Base (PGB) ) 13 with a mounted lower part of a protection structure 17 (fig. 8) .
The subsea production equipment which is being used will, as mentioned supra, be subject to damage of different types, e.g. falling objects from above or over-trawling by fishing boats etc. To protect the petrol-winning equip¬ ment there will preferably be located protecting hoods over the equipment and which lie over each single well. Such protective hoods is of great importance for pro¬ tecting the subsea equipment and the foundation/template construction according to the invention, and with the present foundation/template construction it is preferred to use protecting hoods being divided in sections.
The installation of such hoods is shown in fig. 9 wherein there also is shown the sectionvise division of the hood assembly. The lower part 17 of the hood assembly is mounted and installed together with permanent guidance frame (PGB) . The middle part 18 of the hood assembly is installed and mounted together with the valve tree 15 or other production equipment being placed on top of the lower section. The upper part 19 of the protection struc- ture is installed and finally mounted together with the valve tree cap (tree cap) 16 on top of the middle part 18. In figure 9 there is shown an assembly of three parts of the protection construction which is relevant for instal¬ lation and finishing of production (or injection) wells. When installing the manifold on the central foundation 1 and e.g. tightening modules on one of the arms 2, the two upper sections 18,19 of the protection structure is in¬ stalled mounted toghether in one operation.
The foundation/template construction according to the invention will be illuminated infra in connection with one embodiment example. The indicated embodiment example being relevant for a conventional drilling wherein the wells are established with a 30" (762 mm) lining pipe, is in no way to be regarded as limiting for the invention. In other drilling techniques, e.g. "thin hole drilling", some of the dimensions may be altered.
In the indicated embodiment of the figures the central foundation 1 comprises a quadratic body with side edges by a size of 2900 mm. Through the central foundation 1 and the arms 2 there runs a penetrating hole 3,4 being 914,4 mm in diameter. This makes room for a lining pipe (6,12) of 762 mm in diameter running through the hole 3,4. The distance between the centre of the central hole 3 and the centre of the holes 4 running through the arms 2, is 6000 mm. The height of the foundation/template construction
(arms 2 and central foundation 1) is 1000 mm. On the arms 2 the distance from the hinges to the inclination of the reciprocal parts of the arms is 1250 mm and the length of the arms where the parts incline towards each other to- wards the centre of the penetrating hole 4 is 3250 mm. In this embodiment it is preferred to use joined welded steel plates with a material thickness of between 10 and 50 mm.
The supporting devices 8 for the arms 2 being shown in figs. 13 and 14, comprise in this embodiment circular discs ("mud mats") with a diameter of 2000 mm. These discs are hinged by using a ball bearing to the adjustable arms, said arms in their turn being hinged at the mounting point to the arms 2. Such a construction has as an effect that the supporting devices 8 may be adjusted in any angle in relation to the foundation, but it will be pointed out that this embodiment is only one of a number of possibili¬ ties, since the mechanical properties of the sea floor require varying demands as to size and design of the "mud mats" .
In the disclosure given supra, the foundation/template construction according to the invention has been indicated with respect to the embodiment shown in the figures, but obvious variations of the construction will be evident to the person skilled in the art without departing from the idea behind the foundation/template construction.

Claims

C l a i m s
1. Subsea foundation/template construction for petrol production whereon there may be mounted further production equipment (15,16,17,18,19,20), said foundation/template construction in assembled condition may be placed over a pre-drilled hole (12) in the sea floor, where the founda¬ tion/template construction comprises a polygon, e.g. a square, central body (1) , c h a r a c t e r i z e d i n that it through the polygon central body (1) runs one single penetrating hole (3) wherein there may be placed a leading pipe (6) for the founding of the construction, to which central body (1) there is mounted at least one horizontally hinged and vertically pivotable arm (2) , where said arm(s) (2) may be locked to the central body (1) in a mainly horizontal position, and where the arm(s) prior to mounting/locking to the central body (1) is/are pivotable from a mainly upright position to a mainly horizontal position over an arc of about 90° in relation to the central body (1), where the arm(s) (2) in their distal area from the central body (1) comprise(s) one single hole for the penetration of further guidance pipes (15) running mainly parallel to the leading pipe (6) running through the central body (1) .
2. Foundation/template construction according to claim 1, c h a r a c t e r i z e d i n that the arm(s) (2) comprise(s) nivellation/supporting devices.
3. Foundation/template construction according to claim 1 or 2, c h a r a c t e r i z e d i n that there over the central body (1) and optionally the arm(s) (2) may be mounted protecting structures (17,18,19).
PCT/NO1995/000137 1994-08-23 1995-08-18 Template construction for drilling subsea wells for oil and gas Ceased WO1996006260A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU33565/95A AU3356595A (en) 1994-08-23 1995-08-18 Template construction for drilling subsea wells for oil and gas

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO943105 1994-08-23
NO943105A NO301555B1 (en) 1994-08-23 1994-08-23 Submarine bottom frame for petroleum production

Publications (1)

Publication Number Publication Date
WO1996006260A1 true WO1996006260A1 (en) 1996-02-29

Family

ID=19897331

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO1995/000137 Ceased WO1996006260A1 (en) 1994-08-23 1995-08-18 Template construction for drilling subsea wells for oil and gas

Country Status (3)

Country Link
AU (1) AU3356595A (en)
NO (1) NO301555B1 (en)
WO (1) WO1996006260A1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000001923A1 (en) * 1998-07-03 2000-01-13 Kvaerner Oilfield Products Limited Wellhead templates
US6325158B1 (en) 1997-11-03 2001-12-04 Kongsberg Offshore A/S Method and device for mounting of a seabed installation
US6470973B1 (en) 1997-11-03 2002-10-29 Kongsberg Offshore A/S Side element of a drilling template
US7490670B2 (en) 2003-01-14 2009-02-17 Vetco Gray Scandinavia As Subsea exploitation device
EP2180136A3 (en) * 2008-10-27 2011-10-26 Vetco Gray Inc. System, method and apparatus for a modular production tree assembly to reduce weight during transfer of tree to rig
WO2013127759A3 (en) * 2012-02-27 2014-03-27 Aker Subsea As Washout preventer
CN103993860A (en) * 2014-04-24 2014-08-20 南京航海仪器二厂有限公司 Offshore drilling base plate
WO2016085352A1 (en) * 2014-11-26 2016-06-02 Statoil Petroleum As Subsea equipment-protection apparatus
WO2021191354A1 (en) * 2020-03-26 2021-09-30 Fmc Kongsberg Subsea As Modularized subsea compressor train and method of installation
US11286601B2 (en) 2012-12-20 2022-03-29 Convatec Technologies, Inc. Processing of chemically modified cellulosic fibres
US11293248B2 (en) 2017-10-26 2022-04-05 Equinor Energy As Wellhead assembly installation
WO2024162857A1 (en) * 2023-01-30 2024-08-08 Aker Solutions Subsea As Wellbore installation apparatus and method of lower an apparatus to seabed

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO346267B1 (en) * 2019-08-22 2022-05-16 Fmc Kongsberg Subsea As Subsea wellhead support system and associated method of installing a subsea wellhead support system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO139231B (en) * 1977-05-09 1978-10-16 Saga Petroleum CONSTRUCTION FOR DOWNLOADING AND ANCHORING GUIDELINES BETWEEN A FLOATING DRILLING RIG AND THE SEAL
NO152060B (en) * 1977-09-02 1985-04-15 Standard Oil Co SUBMARAGEMENT AND PROCEDURE FOR THIS SUBMISSION
GB2202257A (en) * 1987-03-19 1988-09-21 British Petroleum Co Plc Underwater drilling template

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO139231B (en) * 1977-05-09 1978-10-16 Saga Petroleum CONSTRUCTION FOR DOWNLOADING AND ANCHORING GUIDELINES BETWEEN A FLOATING DRILLING RIG AND THE SEAL
NO152060B (en) * 1977-09-02 1985-04-15 Standard Oil Co SUBMARAGEMENT AND PROCEDURE FOR THIS SUBMISSION
GB2202257A (en) * 1987-03-19 1988-09-21 British Petroleum Co Plc Underwater drilling template

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6325158B1 (en) 1997-11-03 2001-12-04 Kongsberg Offshore A/S Method and device for mounting of a seabed installation
US6470973B1 (en) 1997-11-03 2002-10-29 Kongsberg Offshore A/S Side element of a drilling template
GB2355999A (en) * 1998-07-03 2001-05-09 Kvaerner Oilfield Products Ltd Wellhead templates
GB2355999B (en) * 1998-07-03 2002-05-22 Kvaerner Oilfield Products Ltd Wellhead templates
US6409430B1 (en) 1998-07-03 2002-06-25 Kvaerner Oilfield Products Limited Welhead templates
WO2000001923A1 (en) * 1998-07-03 2000-01-13 Kvaerner Oilfield Products Limited Wellhead templates
US7490670B2 (en) 2003-01-14 2009-02-17 Vetco Gray Scandinavia As Subsea exploitation device
EP2180136A3 (en) * 2008-10-27 2011-10-26 Vetco Gray Inc. System, method and apparatus for a modular production tree assembly to reduce weight during transfer of tree to rig
US8151890B2 (en) 2008-10-27 2012-04-10 Vetco Gray Inc. System, method and apparatus for a modular production tree assembly to reduce weight during transfer of tree to rig
WO2013127759A3 (en) * 2012-02-27 2014-03-27 Aker Subsea As Washout preventer
US11286601B2 (en) 2012-12-20 2022-03-29 Convatec Technologies, Inc. Processing of chemically modified cellulosic fibres
CN103993860A (en) * 2014-04-24 2014-08-20 南京航海仪器二厂有限公司 Offshore drilling base plate
CN103993860B (en) * 2014-04-24 2016-08-24 南京航海仪器二厂有限公司 A kind of offshore drilling basal disc
US10344551B2 (en) 2014-11-26 2019-07-09 Statoil Petroleum As Subsea equipment-protection apparatus
AU2015354875B2 (en) * 2014-11-26 2020-01-23 Equinor Energy As Subsea equipment-protection apparatus
WO2016085352A1 (en) * 2014-11-26 2016-06-02 Statoil Petroleum As Subsea equipment-protection apparatus
US11293248B2 (en) 2017-10-26 2022-04-05 Equinor Energy As Wellhead assembly installation
WO2021191354A1 (en) * 2020-03-26 2021-09-30 Fmc Kongsberg Subsea As Modularized subsea compressor train and method of installation
US11970924B2 (en) 2020-03-26 2024-04-30 Fmc Kongsberg Subsea As Modularized subsea compressor train and method of installation
WO2024162857A1 (en) * 2023-01-30 2024-08-08 Aker Solutions Subsea As Wellbore installation apparatus and method of lower an apparatus to seabed

Also Published As

Publication number Publication date
NO301555B1 (en) 1997-11-10
NO943105D0 (en) 1994-08-23
NO943105L (en) 1996-02-26
AU3356595A (en) 1996-03-14

Similar Documents

Publication Publication Date Title
RU2365730C2 (en) Drilling rig installed on sea bottom and designed for drilling of oil and gas wells
AU2002256234B2 (en) Multipurpose unit with multipurpose tower and method for tendering with a semisubmersible
WO1996006260A1 (en) Template construction for drilling subsea wells for oil and gas
US3881549A (en) Production and flare caisson system
RU2226164C2 (en) Swivel unit
US20050126790A1 (en) Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer
CN109312552B (en) Unit and method for providing seabed support of shallow water drilling terminal
US20060140726A1 (en) Riser installation vessel and method of using the same
US5722796A (en) Hinge-over subsea template production system
AU1606395A (en) Tension leg platform and method of installation therefor
MX2010012373A (en) Offshore unit and method of installing wellhead platform using the offshore unit.
CN101939215A (en) Docking and drilling stations for running self-standing risers
US8052369B2 (en) Device for storing tubulars and devices for handling of tubulars
EP3645380B1 (en) Continuous vertical tubular handling and hoisting buoyant structure
NO315508B1 (en) Method of installing a tower system on a vessel, as well as a converted vessel including a tower system
DK171998B1 (en) Procedure for installing a marine structure
US5702206A (en) Offshore support structure method and apparatus
US4662784A (en) Method of installing pipe strings through offshore drilling platforms already in place
AU2005200422A1 (en) Apparatus and Method
CN218116529U (en) Underwater equipment device with integral and split installation functions
US4510985A (en) Stacked open bottom temporary guide base for offshore drilling
GB2408767A (en) Method of constructing a piled offshore platform
CA2232303C (en) Telescoping derrick
AU689950B2 (en) Method for constructing and installing an offshore gravity plaftorm structure and platform structure designed for the implementation of this method
CA2825930C (en) Method and system for installing subsea well trees

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AM AT AT AU BB BG BR BY CA CH CN CZ CZ DE DE DK DK EE EE ES FI FI GB GE HU IS JP KE KG KP KR KZ LK LR LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SK TJ TM TT UA UG US UZ VN

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): KE MW SD SZ UG AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase