PT1621671E - A high safety, modular system for provisionally supporting working railway tracks during under-track works. - Google Patents
A high safety, modular system for provisionally supporting working railway tracks during under-track works. Download PDFInfo
- Publication number
- PT1621671E PT1621671E PT05380135T PT05380135T PT1621671E PT 1621671 E PT1621671 E PT 1621671E PT 05380135 T PT05380135 T PT 05380135T PT 05380135 T PT05380135 T PT 05380135T PT 1621671 E PT1621671 E PT 1621671E
- Authority
- PT
- Portugal
- Prior art keywords
- loadbearing
- crossbeams
- modular system
- rails
- high safety
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 230000000284 resting effect Effects 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B37/00—Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
- E01B2/003—Arrangement of tracks on bridges or in tunnels
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Railway Tracks (AREA)
- Automatic Assembly (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
- Chain Conveyers (AREA)
- Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
Abstract
A high safety, modular system for provisionally supporting working railway tracks during under-track works. In order to carry out infrastructures such as underpasses under the railway tracks a number of rails (V1,V2) are arranged in a parallel arrangement with respect to the railway track, said rails (V1,V2) being inferiorly connected to each other by a transversal rail section, this system being nevertheless hard to implement and lacking in solidity. The modular system of the invention comprises a plurality of loadbearing crossbeams (VC) being arranged in an inferior and transversal arrangement with respect to the railway track rails (V1,V2), said loadbearing crossbeams (VC) being parallel to the crossties (T), and a number of pairs of longitudinal staying beams (VA) being arranged in a parallel arrangement with respect to the railway track rails (V1,V2) in the middle area between them and at both their sides, said staying beams (VA) resting on the plurality of loadbearing crossbeams (VC), the loadbearing crossbeams (VC) and the staying beams (VA) being joined together by means of lowerable steel blocks (JN).
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ES200401870A ES2261024B1 (en) | 2004-07-29 | 2004-07-29 | HIGH SECURITY MODULAR SYSTEM FOR PROVISIONAL SUPPORT OF RAILWAYS IN CIRCULATION DURING WORK UNDER VIA. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PT1621671E true PT1621671E (en) | 2008-05-07 |
Family
ID=35197812
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PT05380135T PT1621671E (en) | 2004-07-29 | 2005-06-23 | A high safety, modular system for provisionally supporting working railway tracks during under-track works. |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP1621671B1 (en) |
| AT (1) | ATE389748T1 (en) |
| DE (1) | DE602005005398T2 (en) |
| ES (2) | ES2261024B1 (en) |
| PT (1) | PT1621671E (en) |
Families Citing this family (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2282007B1 (en) | 2006-05-29 | 2014-07-23 | Petrucco, S.A. | Supporting arrangement |
| ES2361288B1 (en) * | 2006-07-13 | 2012-02-13 | Obras, Proyectos, Ecologia Y Medio Ambiente, S.L. (Opema) | Mobile bridge for its support or attachment of railway tracks. |
| ES2370711B1 (en) * | 2008-02-26 | 2012-10-30 | Obras Y Proyectos, Ecología Y Medio Ambiente S.L. (Opema) | New track attachment for any width of it. |
| ITUD20080177A1 (en) * | 2008-07-28 | 2010-01-29 | Natisone Lavori S R L | TEMPORARY BRIDGE FOR THE CONSTRUCTION OF UNDERPASSES AND ITS INSTALLATION PROCEDURE |
| EP2631424B1 (en) * | 2010-10-20 | 2017-11-29 | Petrucco S.A. | Support structure |
| CN102505585B (en) * | 2011-12-07 | 2013-12-11 | 山西四建集团有限公司 | Construction process of rocket sled |
| FR3000113B1 (en) * | 2012-12-21 | 2016-05-06 | Soc Nat Des Chemins De Fer Francais Sncf | SUPPORT STRUCTURE OF A PORTION OF RAILWAY. |
| FR3002955B1 (en) * | 2013-03-07 | 2016-09-09 | Soc Nat Des Chemins De Fer Francais Sncf | STIFFENER FOR RAILWAY AND METHOD FOR MANUFACTURING SUCH STIFFENER |
| EP3741957B1 (en) * | 2018-01-17 | 2023-02-22 | Petrucco S.A. | Modular support structure |
| CN108239896A (en) * | 2018-03-21 | 2018-07-03 | 中铁二十三局集团第四工程有限公司 | Existing railway Disease Treatment of Foundation Base fixed track usage plan constructing structure and construction method |
| CN109024108B (en) * | 2018-09-28 | 2024-03-15 | 中铁磁浮交通投资建设有限公司 | Modularized track panel of large-displacement telescopic device of medium-low-speed magnetic levitation bridge |
| CN109024111B (en) * | 2018-09-28 | 2024-08-06 | 中铁磁浮交通投资建设有限公司 | Simply supported longitudinal beam structure of large-displacement modularized telescopic device of medium-low-speed magnetic levitation bridge |
| CN109024110B (en) * | 2018-09-28 | 2024-03-15 | 中铁磁浮交通投资建设有限公司 | X-shaped connecting rod device of middle-low speed magnetic levitation bridge large-displacement telescopic device |
| CN109024109B (en) * | 2018-09-28 | 2024-08-06 | 中铁磁浮交通投资建设有限公司 | Multi-freedom-degree support of middle-low-speed magnetic levitation bridge large-displacement modularized telescopic device |
| CN110230238B (en) * | 2019-06-18 | 2024-04-09 | 中铁第五勘察设计院集团有限公司 | Railway line protection device and protection method |
| ES2895751A1 (en) * | 2020-08-19 | 2022-02-22 | Lopez Oscar Dieguez | Mobile Bridge for Senior Or Railroad Range in Great Vanos (Machine-translation by Google Translate, not legally binding) |
| CN112253844B (en) * | 2020-09-29 | 2022-04-22 | 北京政平建设投资集团有限公司 | Self-monitoring guide rail |
| CN112921715A (en) * | 2021-01-20 | 2021-06-08 | 中铁工程设计咨询集团有限公司 | Track beam for rubber-tyred tramcar and construction method thereof |
| CN112921716A (en) * | 2021-01-20 | 2021-06-08 | 中铁工程设计咨询集团有限公司 | Duplex steel rail beam for rubber-tyred tramcars and construction method |
| KR102261628B1 (en) * | 2021-03-10 | 2021-06-07 | 주식회사 브리텍 | Rail reinforced smart module and its construction method |
| CN113174789A (en) * | 2021-05-14 | 2021-07-27 | 中铁二十四局集团有限公司 | Railway fastening rail reinforcing process and equipment |
| WO2023175205A1 (en) * | 2022-03-17 | 2023-09-21 | Oscar Dieguez Lopez | Movable bridge for holding up or supporting railways tracks on large spans |
| ES1298931Y (en) * | 2023-02-01 | 2023-06-30 | Obras Y Proyectos Ecologia Y Medio Ambiente S L | Track shoring or suspension |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| IT1234182B (en) * | 1989-03-03 | 1992-05-05 | Casagrande Spa | REVERSE ARCH EXCAVATION PROCESS IN EXISTING GALLERIES AND EQUIPMENT ADOPTING SUCH PROCESS. |
| IT1255694B (en) * | 1992-09-29 | 1995-11-10 | Provisional structure for supporting railway tracks | |
| JP2909814B2 (en) * | 1997-09-04 | 1999-06-23 | 川崎重工業株式会社 | How to update a railway bridge |
| ES2151364B1 (en) * | 1997-10-27 | 2001-06-16 | Alicantina De Construcciones I | APEO OF VIA FERREA FOR EXECUTION OF LOWER STEPS. |
| DE10022311B4 (en) * | 1999-05-22 | 2010-01-28 | Ed. Züblin Ag | Device for producing slab tracks |
| DE10033272A1 (en) * | 2000-07-10 | 2002-02-14 | Moelders Baugmbh | Railway permanent way has a concrete layer to support the sleepers, in one-piece slabs with reinforcement steel fibers, extending over several sleepers for rapid laying with accurate alignment |
-
2004
- 2004-07-29 ES ES200401870A patent/ES2261024B1/en not_active Expired - Fee Related
-
2005
- 2005-06-23 AT AT05380135T patent/ATE389748T1/en active
- 2005-06-23 DE DE602005005398T patent/DE602005005398T2/en not_active Expired - Lifetime
- 2005-06-23 ES ES05380135T patent/ES2302159T3/en not_active Expired - Lifetime
- 2005-06-23 PT PT05380135T patent/PT1621671E/en unknown
- 2005-06-23 EP EP05380135A patent/EP1621671B1/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| EP1621671A2 (en) | 2006-02-01 |
| DE602005005398T2 (en) | 2009-04-23 |
| DE602005005398D1 (en) | 2008-04-30 |
| EP1621671A3 (en) | 2006-05-24 |
| ATE389748T1 (en) | 2008-04-15 |
| ES2261024A1 (en) | 2006-11-01 |
| ES2302159T3 (en) | 2008-07-01 |
| ES2261024B1 (en) | 2007-09-16 |
| EP1621671B1 (en) | 2008-03-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| PT1621671E (en) | A high safety, modular system for provisionally supporting working railway tracks during under-track works. | |
| WO2005049457A3 (en) | Conveyor and support | |
| UA39188C2 (en) | Appliance for transportation of track sections | |
| WO2012028895A1 (en) | Road-rail vehicle with framework for modular employment of service equipment for railway track superstructures | |
| SI1369330T1 (en) | Maintenance vehicle | |
| PT1869253E (en) | Solid railway for track vehicles, and method for the production thereof | |
| DE502004002196D1 (en) | Method for producing a track structure for rail-bound vehicles, in particular railways | |
| ATE527412T1 (en) | BENDING BEAM MADE OF STEEL AND A TURNOUT ARRANGEMENT MADE THEREFROM FOR MAGNETIC ELEVATION TRAINS | |
| DE502006001140D1 (en) | ||
| US8459570B2 (en) | Supporting arrangement | |
| DK1026321T3 (en) | Steel connecting device for rail sleepers, especially for reinforced concrete track switches | |
| JP4538664B2 (en) | Ladder-shaped sleeper | |
| ATE433403T1 (en) | COUPLING ROD WITH DIRECTIONAL JOINTS IN RAILWAY CAR UNITS | |
| DK1203707T3 (en) | Method for the conversion of railway wagons and railway wagons obtained by this method | |
| TW200639295A (en) | Level railway crossing | |
| CN107934861B (en) | A kind of traffic vcehicular tunnel maintenance and reinforcement platform | |
| UA80806C2 (en) | Machine and method for rail track tie tamping | |
| RU2148686C1 (en) | Switching unit of railway switch | |
| DE502005008352D1 (en) | ||
| EP2282007B1 (en) | Supporting arrangement | |
| RU2171327C1 (en) | Track-laying crane | |
| SU755934A1 (en) | Line for raylway unit assemblying | |
| PT1805366E (en) | Multipurpose route consisting of laminated wood | |
| WO2005078195A3 (en) | Tie for a ballasted track | |
| ATE435334T1 (en) | METHOD FOR CONSTRUCTING A RAIL TRACK FOR RAILWAYS AND THE LIKE. AND A RAILWAY BUILT BY THIS METHOD |