CN201151603Y - Hoisting device at Mine Inclined Shaft - Google Patents

Hoisting device at Mine Inclined Shaft Download PDF

Info

Publication number
CN201151603Y
CN201151603Y CNU2007200656374U CN200720065637U CN201151603Y CN 201151603 Y CN201151603 Y CN 201151603Y CN U2007200656374 U CNU2007200656374 U CN U2007200656374U CN 200720065637 U CN200720065637 U CN 200720065637U CN 201151603 Y CN201151603 Y CN 201151603Y
Authority
CN
China
Prior art keywords
lifting
bont
inclined shaft
cover
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200656374U
Other languages
Chinese (zh)
Inventor
陶平凯
刘福春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CINF Engineering Corp Ltd
Original Assignee
Changsha Design Institute of Nonferrous Metallurgy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Design Institute of Nonferrous Metallurgy filed Critical Changsha Design Institute of Nonferrous Metallurgy
Priority to CNU2007200656374U priority Critical patent/CN201151603Y/en
Application granted granted Critical
Publication of CN201151603Y publication Critical patent/CN201151603Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a lifting device applied to mines. Two sets of lifting devices with a same lifting center line but with different rail gages are arranged in the same inclined lifting shaft; either lifting device has an interlock control that can not operate simultaneously; a middle suspension bridge is arranged at the middle section in the shaft, a shaft-top bridge is arranged at the upper part of the lifting device. Compared with the prior art, the lifting device has the advantages of big lifting capability, less engineering work load and investment, less occupied space, etc.

Description

The slope bont
Technical field
The utility model relates to the bont that uses in a kind of mine.
Background technology:
When existing mine hoisting adopts inclined shaft hoisting, when lifting capacity hour, generally adopt a cover bont.Adopt tube-train hoisting ore, barren rock, material, equipment etc., the personnel selection car promotes personnel.When the ore lifting capacity is big, generally adopt two inclined shafts of major-minor, arrange two cover bonts respectively, promptly main slant adopts a cover skip hoisting plant, is used for lifting ore and barren rock, and subincline is established a cover bont in addition, is used for lifting personnel, material etc.The former reduced investment, quantities is little, but hoisting capacity is little, and reliable degree is low than skip hoisting, and mechanization, degree of automation are low than skip hoisting.Latter's hoisting capacity is big, but quantities is big, and investment is big, and it is big to take industrial place.When lifting capacity is in when medium, when inclined shaft length was longer, when adopting a cover tube-train hoisting, hoisting capacity failed to satisfy requirements, and when adopting two cover bonts, quantities is big, and investment is big, and it is big to take industrial place, complex management.
The utility model content
The utility model provides a kind of scheme of arranging two cover bonts in same lifting inclined shaft in order to overcome the shortcoming of only arranging a cover bont in the same inclined shaft of the prior art.
The technical solution of the utility model is: in the same lifting inclined shaft in mine, establish same lifting line of centers but two cover bonts of different gauges; Two cover bonts are provided with the chain control that bont can not be worked simultaneously; The stage casing suspension bridge is established in each stage casing, down-hole, is provided with the well head suspension bridge on the top of bont.
One cover is carried device for the skip bucket master, undertakes ore deposit, barren rock lifting; The secondary bont of one cover is undertaken lifting tasks such as personnel, equipment, material.In deviated well bore, the elevator road of two cover bonts uses same railway roadbed, and inside is the secondary track that promotes, and the outside is the main track that promotes.The shared steel cable idler pulley of two cover bonts, sleeper etc.The stage casing suspension bridge is established in each stage casing, down-hole, realizes that the interior pair of inclined shaft promotes the elevator road and this stage casing transportation route is got in touch, and when stage casing, down-hole suspension bridge put down, secondary lifting container can enter the parking lot, stage casing in inclined shaft, and when stage casing, down-hole suspension bridge was mentioned, major and minor lifting container all passed through.At slope mouth, the secondary elevator road that promotes is by directly being connected with the secondary transportation route that promotes in ground with vertical curve, the main elevator road that promotes realizes that by the well head suspension bridge inclined shaft is connected with the main elevator road that promotes on the trestle of ground, when the well head suspension bridge rises, secondary lifting container and need the material of lifting, equipment to enter inclined shaft by well head.When the well head suspension bridge put down, main lifting container (skip bucket) can be promoted to ore storage bin top unloading position from inclined shaft shaft bottom loading depot smoothly.Concrete configuration is seen accompanying drawing.
The slope bont that the utility model provides compared with prior art has lifting greatly, and quantities and small investment are taken up an area of advantages such as few.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the birds-eye view of structural representation among Fig. 1.
The specific embodiment:
Promote in the inclined shaft in the ore deposit, Guangxi, be provided with the major-minor bont of not working simultaneously at two covers of same lifting line of centers, promptly main lifting of a cover is the skip bucket single-hoisting, and gauge 1500mm, another set of secondary the lifting are the bunching single-hoisting, gauge 600mm.The slope mouth absolute altitude is 690m, and there are 300m, 350m, three downhole production stage casings of 400m in the down-hole, and ore is transferred by drop shaft, inclined shaft dress ore deposit point absolute altitude is 385m, and well head unloading point absolute altitude is 710m, promotes tiltedly long 769 meters, inclined shaft inclination angle 25 degree, ore is undertaken in skip hoisting and the part barren rock promotes.Lifting means is the single rope of a JK-2.5/20 monotubular cylindrical drum hoist 1, drum diameter φ 2.5m, and steel rope biggest quiet tension allowable and biggest quiet tension difference are 98KN, speed ratio 20, adapted JR1512-8 type alternating current dynamo 2, power 630Kw, rated speed of rotation 740rpm, maximum lift speed is 4.8m/s.Promoting steel cable is 6 Δs (19) φ 31mm triangular strand wire rope 3, and steel cable nominal tensile strength is 1680MPa, and the breaking force of rope summation is 729.6KN.Lifting container is 5m 3Rear-unloading type inclined shaft skip 4, normal load is 10t, hoisting capacity is 95t/h.The pair of inclined shaft promotes the lifting tasks such as mine producers, material, equipment of undertaking.Secondary lifting means is a JK-2/20 type list rope mining hoist 5, joins JR148-8 type alternating current dynamo 6, and power of motor is 240Kw, voltage 6000V, rated speed of rotation 735rpm, maximum lift speed 3.7m/s, promoting steel cable biggest quiet tension and biggest quiet tension difference is 58.84KN.Promote steel cable 7 and select 6 Δs (19) φ 26mm triangular strand wire rope for use, steel cable nominal tensile strength is 1680MPa.Steel cable rupture pull force summation is 498KN.During the lifting personnel, promote two XRC15-6/6 type people cars 8 at every turn, each people Che Chengren 15 people, during the jacking equipment material, weight is no more than 5000kg.
Working process
Major-minor two cover bonts do not use simultaneously, when the skip bucket master carries device and starts working, secondary hoisting cable is packed up, well head suspension bridge 9 puts down, stage casing, down-hole suspension bridge is mentioned, and main electromotor is removed chain, and the skip bucket that is locked on the well head unloading trestle is transferred to dress ore deposit, dress station, ore deposit, shaft bottom, behind the dress ore deposit, be promoted to the well head ore storage bin and ore in the skip bucket unloaded by dump rail 10.When secondary bont is started working, empty skip bucket to be parked on the well head unloading trestle, the well head suspension bridge is mentioned, the main electromotor locking, need the stage casing suspension bridge 11 of work to put down the down-hole, the secondary lifting started working, and realizes promoting parking lot intersegmental lifting and transferring to the underground work from well head is secondary.

Claims (1)

1, the slope bont comprises track, bont; It is characterized in that in the same lifting inclined shaft in mine, establish same lifting line of centers but two cover bonts of different gauges; Two cover bonts are provided with the chain control that bont can not be worked simultaneously; The stage casing suspension bridge is established in each stage casing, down-hole, is provided with the well head suspension bridge on the top of bont.
CNU2007200656374U 2007-12-29 2007-12-29 Hoisting device at Mine Inclined Shaft Expired - Fee Related CN201151603Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200656374U CN201151603Y (en) 2007-12-29 2007-12-29 Hoisting device at Mine Inclined Shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200656374U CN201151603Y (en) 2007-12-29 2007-12-29 Hoisting device at Mine Inclined Shaft

Publications (1)

Publication Number Publication Date
CN201151603Y true CN201151603Y (en) 2008-11-19

Family

ID=40127280

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200656374U Expired - Fee Related CN201151603Y (en) 2007-12-29 2007-12-29 Hoisting device at Mine Inclined Shaft

Country Status (1)

Country Link
CN (1) CN201151603Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095300A (en) * 2018-09-19 2018-12-28 淮北矿业股份有限公司 A kind of main shaft receives holding capacity of bin perseverance and keeps system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095300A (en) * 2018-09-19 2018-12-28 淮北矿业股份有限公司 A kind of main shaft receives holding capacity of bin perseverance and keeps system

Similar Documents

Publication Publication Date Title
CN103334755A (en) Slope hoisting and crushing system for deep open-pit mine
CN202690063U (en) Derrick-free shaft-sinking construction device for mine shaft
CN109607384B (en) Turning-over method for cutter head of super-large-diameter shield tunneling machine
CN105645275B (en) Cable hoist and its construction method
CN102042031A (en) Process for replacing adhesive tape for adhesive tape transporter of coal mine main shaft loading chamber
CN103523667A (en) Mining steel rope traction monorail crane transportation system and transportation method thereof
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN201151603Y (en) Hoisting device at Mine Inclined Shaft
CN215208114U (en) Device for hoisting materials for shield construction of underground excavation transverse passage of subway
CN105565130A (en) Coal mine vertical shaft combined hoisting system
WO2023155194A1 (en) Gravity energy storage system
CN111335941B (en) Method for dredging and blocking inclined chute ore drawing and transferring equipment of strip mine
CN111284282B (en) Single rope lifting and counterweight method for middle and small mine inclined shaft automobile
CN109516355B (en) Single track hangs mechanical type and prevents sports car system for inclined drifts way in pit
CN102220879B (en) Mine underground transport vehicle park
CN2353713Y (en) Rotary Bucket Elevator
CN206626333U (en) Suitable for the Winch for mine dispatch of coal mine roadway
CN206125039U (en) A round alarm device is taken off in colliery monkey car wire rope in pit
CN204162262U (en) A kind of coal mine shaft lining mixed lifting system
CN212027787U (en) Combined mine exploitation system based on vertical shaft and adhesive tape inclined shaft
RU2236370C1 (en) Mine hoisting plant
CN106629375A (en) Lifting mechanism for single-rail crane and single-rail crane lifting beam
CN202465196U (en) Tunnel stacker crane
Wolpers Thyssenkrupp's Skip Way System offers an alternative
CN111977541A (en) Transportation method of heavy equipment under large-gradient condition under mine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHANGSHA ENGINEERING + RESEARCH INSTITUTE LTD. OF

Free format text: FORMER NAME: CHANGSHA DESIGN INST. OF NON-FERROUS METALLURGY

CP01 Change in the name or title of a patent holder

Address after: 410001 No. 199 Jiefang Middle Road, Hunan, Changsha

Patentee after: Changsha Engineering & Research Institute of Nonferrous Metallurgy Co., Ltd.

Address before: 410001 No. 199 Jiefang Middle Road, Hunan, Changsha

Patentee before: Changsha Design Inst. of Non-Ferrous Metallurgy

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20161229

CF01 Termination of patent right due to non-payment of annual fee