Davtalab et al., 2018 - Google Patents
Perspectives on a BIM-integrated software platform for robotic construction through Contour CraftingDavtalab et al., 2018
- Document ID
- 850867087683640747
- Author
- Davtalab O
- Kazemian A
- Khoshnevis B
- Publication year
- Publication venue
- Automation in construction
External Links
Snippet
Robotic construction through concrete 3D printing is an in-progress revolution in construction industry. While significant progress is made on hardware related challenges, software and information related issues of such innovative system are less discussed. In this …
- 238000010276 construction 0 title abstract description 147
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5004—Architectural design, e.g. building design
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/4097—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by using design data to control NC machines, e.g. CAD/CAM
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/04—CAD in a network environment
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Davtalab et al. | Perspectives on a BIM-integrated software platform for robotic construction through Contour Crafting | |
| He et al. | BIM-enabled computerized design and digital fabrication of industrialized buildings: A case study | |
| Martinelli et al. | Methodology for an HBIM workflow focused on the representation of construction systems of built heritage | |
| Manrique et al. | Automated generation of shop drawings in residential construction | |
| Lee et al. | Trends in 3D printing technology for construction automation using text mining | |
| Kim et al. | Current trends and future directions of free-form building technology | |
| Martínez-Rocamora et al. | Parametric programming of 3D printed curved walls for cost-efficient building design | |
| Kuzmenko et al. | Assessing the environmental viability of 3D concrete printing technology | |
| Chen et al. | Integration of information and automation technologies in bridge engineering and management: Extending the state of the art | |
| Cabibihan et al. | A guided approach for utilizing concrete robotic 3D printing for the architecture, engineering, and construction industry | |
| Garcés et al. | Additive Construction 4.0: a systematic review of 3D concrete printing for Construction 4.0 | |
| KR20110129172A (en) | Building design and energy performance evaluation module | |
| Cascone et al. | Digital construction: 3D printing for performative houses | |
| Karhu | Product model based design of precast facades | |
| Muthumanickam et al. | BIM for design generation, analysis, optimization, and construction simulation of a Martian habitat | |
| Omurtay et al. | Use of BIM with Modular Construction in Future Construction Techniques | |
| Zhao et al. | RETRACTED ARTICLE: Application and development of BIM technology in prefabricated building design | |
| Song et al. | Generating a daily bill of materials at level of development 400 using the smallest workface boundary | |
| Jongeling et al. | nD modelling in the development of cast in place concrete structures | |
| Wang et al. | Integrated Building Information Modelling and 3D Printing for Prefabricated Building | |
| Sacks | Construction Tech: innovation founded on Lean theory and BIM technology | |
| Lu et al. | Dynamic data monitoring of building information of nano-modified building steel structure materials using BIM Model | |
| Reisinger et al. | BIM-based workflows for building energy modelling–a variant study | |
| Rojas et al. | An integrated BIM planning workflow for 3D concrete printing projects | |
| Huang et al. | Research on 4D Visual BIM Technology in Dynamic Decora-tion Building Site Construction |