Honti et al., 2018 - Google Patents
Possibilities of bim data exchangeHonti et al., 2018
View PDF- Document ID
- 4020448161091977518
- Author
- Honti R
- Erdélyi J
- Publication year
- Publication venue
- International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM
External Links
Snippet
ABSTRACT Building Information Modeling (BIM) is an intelligent 3D model-based process that gives Architecture, Engineering, and Construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure …
- 238000010276 construction 0 abstract description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
- G06F17/30575—Replication, distribution or synchronisation of data between databases or within a distributed database; Distributed database system architectures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/20—Handling natural language data
- G06F17/21—Text processing
- G06F17/24—Editing, e.g. insert/delete
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Sadeghi et al. | Developing building information models (BIM) for building handover, operation and maintenance | |
| Maltese et al. | Sustainability assessment through green BIM for environmental, social and economic efficiency | |
| Gourlis et al. | Building Information Modelling for analysis of energy efficient industrial buildings–A case study | |
| Vanlande et al. | IFC and building lifecycle management | |
| McArthur | A building information management (BIM) framework and supporting case study for existing building operations, maintenance and sustainability | |
| Monteiro et al. | Framework for the coordinated application of two different integrated project delivery platforms | |
| Mattern et al. | BIM-based modeling and management of design options at early planning phases | |
| CA2796664C (en) | Automated re-use of structural components | |
| Honti et al. | Possibilities of bim data exchange | |
| Isaac et al. | Feasibility study of an automated tool for identifying the implications of changes in construction projects | |
| US10254745B2 (en) | Computer-implemented automated design, modeling and manufacturing system for a project | |
| Staub-French et al. | Linear scheduling and 4D visualization | |
| Wen et al. | A BIM-based space-oriented solution for hospital facilities management | |
| Ramaji et al. | Extending the current model view definition standards to support multi-storey modular building projects | |
| US11531324B2 (en) | Method and system for cross discipline data validation checking in a multidisciplinary engineering system | |
| Saraireh et al. | Understanding the conceptual of building information modeling: a literature review | |
| Korman et al. | Prototype tool for mechanical, electrical, and plumbing coordination | |
| Daniotti et al. | Benefits and challenges using BIM for operation and maintenance | |
| Krämer et al. | IT environments for BIM in FM | |
| Lima et al. | Experience in the field of sustainability enhanced construction classification system | |
| Brucker et al. | Building Information Modeling (BIM): a road map for implementation to support MILCON transformation and civil works projects within the US Army Corps of Engineers | |
| Lucas et al. | Using a case-study approach to explore methods for transferring BIM-based asset data to facility management systems | |
| Teicholz | Owner BIM for FM guidelines | |
| Trabulci | Interoperability framework for BIM-FM based on a relational database | |
| Andriamamonjy et al. | Sensor handling in building information models. development of a method and application on a case study |